One builder includes the kitchen island shown on your plan. Another includes an island too, and their price is lower. When you look more closely, the first has allowed for drawers on both sides and a finished end panel. The second has priced cupboards on one side and a plain back. Both read the drawing in good faith. Which kitchen did you want?

For an early budget discussion, concept plans can be a starting point. When you want to compare detailed quotes, give every builder the same dated set of drawings and a written list of what to include. Ask your designer which documents are ready for pricing and which decisions still need an allowance.

Build the pack around the work you want priced

    The right set depends on the project. For a bathroom renovation, showing the existing room and the proposed fixture and tile layout may settle more questions than a stack of drawings about untouched rooms. Ask the builder which information would let them firm up their price.

    Follow one kitchen island through the documents

    Suppose your island has a benchtop that continues down one end to the floor. On the floor plan, you can see the island length and its position relative to the fridge. In an interior elevation, you can see which end gets the return and where the drawers sit. In the schedule, you can identify the benchtop finish and whether the same material continues down that end.

    Now check the quote against those details. Is the return included? Does the price include fabrication and installation? If the finish is undecided, what has the builder allowed for, and what does that allowance cover? If you intend to buy the sink yourself, record separately who fits it and who connects it. That small distinction can explain a difference between two totals.

    Give every builder the same revision

    Send one document list with the drawing number, title, date and revision. Include the schedules on that list. If you decide to remove the island return after quotes have been requested, send the same written change to everyone and ask them to identify it in their revised price. Keep the original and revised totals side by side so you can see the effect of the change.

    Ask three questions when the quotes come back

    1. Which drawing and schedule revisions did you use, and which items have you excluded?
    2. Which items carry an allowance, how much is included for each, and does it cover supply, installation or both?
    3. Which selections or details would let you replace an assumption with a firmer price?

    Read the replies alongside the totals. Once both builders have priced the kitchen you actually want, their prices are far easier to compare. If you’re preparing to approach builders, explore our construction documentation services. If you’re still deciding when to involve a builder in the design, read about our design and build approach.