If your project qualifies for Complying Development, you can bypass the council DA process entirely — with approvals typically issued within 2 weeks by a private certifier. Profectus Design manages the full CDC process: from eligibility check to lodgement, documentation, and approval. We'll tell you upfront whether your project qualifies and what the fastest path to construction looks like.

Reviewing Complying Development plans
What Is Complying Development?

A Faster Pathway to Approval

Complying Development is a fast-track approval pathway for projects that meet specific planning requirements under the NSW State Environmental Planning Policy (SEPP). Instead of going through your local council, the application is assessed and approved by a private certifier — typically within 10 to 20 days.

The key advantage is speed. A council DA can take 4 to 12 weeks or longer. A CDC, for an eligible project, can be approved in 2 weeks from date of lodgement.

CDC is commonly used for:

  • Granny flats and secondary dwellings
  • Alterations, additions, and renovations that meet SEPP codes
  • New home builds on residential land meeting SEPP requirements

Not every project qualifies. Eligibility depends on your specific site, lot size, zoning, and the nature of the proposed development. This is the first question we answer.

DA vs CDC — Which One Does Your Project Need?

Not sure if CDC is right for your project? Here's how it compares to a DA — and why CDC is the faster, simpler pathway for eligible projects.

CDC — Complying DevelopmentDA — Development Application
Assessed byPrivate certifierLocal council
Typical timeframe~2 weeks4–12+ weeks
Design flexibilityLower — must meet SEPP codesHigher — greater design freedom
CostGenerally lowerGenerally higher
Best forStandard residential projects on eligible sitesComplex sites, heritage areas, greater flexibility with controls
Council involvementNoneFull council assessment

Is My Project Eligible for CDC?

CDC eligibility depends on a combination of factors specific to your site and project. Common eligibility requirements include:

  • The land is zoned residential under the Local Environmental Plan (LEP)
  • The lot meets minimum size requirements under the SEPP
  • The proposed building meets height, setback, and floor space ratio limits
  • The site is not in a heritage conservation area or on a heritage register
  • The site is not flood-affected, bush fire prone, or in a sensitive environmental zone
  • The development type is listed as permissible under the SEPP Exempt and Complying Development Codes
"We check CDC eligibility as the first step of every engagement. There's no point designing a scheme for a pathway your site doesn't qualify for."

The fastest way to find out if your project qualifies is a Site Feasibility — we review your specific site against the SEPP requirements and give you a clear answer before any design work begins.

Completed San Souci duplex project

Our CDC Process — What Happens and When

Site Feasibility & Eligibility

We review your site against the SEPP Exempt and Complying Development Codes and confirm whether CDC is the right pathway for your project. If it is, we outline the full process, timeframe, and fee.

Concept Design

We design a scheme that meets your brief and complies with the CDC code requirements from day one — no redesign later because we got the codes wrong early.

CDC Documentation

Full CDC package prepared: architectural drawings, BASIX certificate, NCC compliance documentation, and all required consultant reports coordinated and reviewed.

Certifier Appointment & Pre-Lodgement

We appoint and brief a private certifier, share preliminary plans for pre-lodgement feedback, and address any compliance issues before formal lodgement.

Lodgement & Determination

Application lodged. Certifier assesses and issues the CDC — typically within 10 to 20 days. We manage any certifier queries during this period.

Post-Approval & Construction Documentation

Once CDC is issued, we move immediately into construction documentation, ready for builder pricing and construction start.

Covering Greater Sydney & Regional NSW

We've managed CDC applications across Sydney and NSW — including projects in:

Sutherland Shire CouncilGeorges River CouncilCanterbury-Bankstown Council
Northern Beaches CouncilCity of Ryde CouncilInner West Council
Bayside CouncilHornsby Shire CouncilCity of Canada Bay Council
Fairfield City CouncilLiverpool City CouncilWollondilly Shire Council
Shoalhaven City CouncilBlue Mountains CouncilPort Stephens Council

Free Development Feasibility Check


Claim Your FREE 30-Minute Strategy Session To Discover Your Site's Potential
Or call Stephen directly on 0452 493 412 for a quick conversation about your project.
Book Your Free Session